Upper Rahughat Hydroelectric Project
A 48.5 MW run-of-river project on the Rahughat Khola in Myagdi, reported at roughly 70–95% physical progress in early 2025 and in advanced construction, part of the Rahughat-area project cluster.
Installed capacity
49 MW
Run-of-river
River / basin
Rahughat Khola
Gandaki basin
Location
Myagdi
Gandaki
Expected online
TBD
Under construction
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- 2025
~70–95% progress (advanced construction)
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Upper Rahughat Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.