United Mewa Khola Hydropower Projectयुनाइटेड मेवा खोला
A 50 MW run-of-river project on the Mewa Khola in Meringden Rural Municipality, Taplejung, developed by United Mewa Khola Hydropower Ltd (with United Modi holding about 30%). It was reported at roughly 99% completion in 2025, with its powerhouse finished.
Installed capacity
50 MW
Run-of-river
River / basin
Mewa Khola
Koshi basin
Location
Taplejung
Koshi
Expected online
2025
Under construction
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- 2025
~99% complete; powerhouse finished, nearing generation
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for United Mewa Khola Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.