OperationalCommissioned 2016
Upper Madi Hydropower Stationमाथिल्लो मादी
A 25 MW run-of-river plant on the Madi River in Kaski, developed by Madi Power Pvt. Ltd. It began commercial operation on 25 October 2016.
Installed capacity
25 MW
Run-of-river
River / basin
Madi
Gandaki basin
Location
Kaski
Gandaki
Commissioned
2016
Operational
How it was built
Milestones to commissioning
The route from construction to commercial operation.
- 25 Oct 2016
Commercial operation began
On the map
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Loading map…
Filter by stageTiles © OpenStreetMap contributors
Sources & data note
Figures for Upper Madi Hydropower Station are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.