Upper Madi Hydropower Stationमाथिल्लो मादी

A 25 MW run-of-river plant on the Madi River in Kaski, developed by Madi Power Pvt. Ltd. It began commercial operation on 25 October 2016.

Installed capacity

25 MW

Run-of-river

River / basin

Madi

Gandaki basin

Location

Kaski

Gandaki

Commissioned

2016

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 25 Oct 2016

    Commercial operation began

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Upper Madi Hydropower Station are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.