Kabeli B1 Hydropower Stationकबेली बी१

A 25 MW run-of-river plant on the Kabeli Khola (a Tamor tributary) in Panchthar/Taplejung, developed by Arun Kabeli Power Ltd, in commercial operation since 9 November 2019. (The separate 37.6 MW Kabeli-A project remains under development.)

Installed capacity

25 MW

Run-of-river

River / basin

Kabeli Khola

Koshi basin

Location

Panchthar

Koshi

Commissioned

2019

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 9 Nov 2019

    Commercial operation

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Kabeli B1 Hydropower Station are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.