Upper Dordi 'A' Hydropower Projectमाथिल्लो दोर्दी 'ए'
A 25 MW run-of-river plant on the upper Dordi Khola in Lamjung, developed by Liberty Energy Company Ltd. It connected its output to the Dordi corridor in 2022, part of the cluster of five projects that together added about 126 MW from the Dordi valley.
Installed capacity
25 MW
Run-of-river
River / basin
Dordi Khola
Gandaki basin
Location
Lamjung
Gandaki
Commissioned
2022
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 2022
Came into operation; connected to the Dordi corridor
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Upper Dordi 'A' Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.