Upper Dordi 'A' Hydropower Projectमाथिल्लो दोर्दी 'ए'

A 25 MW run-of-river plant on the upper Dordi Khola in Lamjung, developed by Liberty Energy Company Ltd. It connected its output to the Dordi corridor in 2022, part of the cluster of five projects that together added about 126 MW from the Dordi valley.

Installed capacity

25 MW

Run-of-river

River / basin

Dordi Khola

Gandaki basin

Location

Lamjung

Gandaki

Commissioned

2022

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 2022

    Came into operation; connected to the Dordi corridor

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Upper Dordi 'A' Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.