Upper Mugu Karnali Hydroelectric Projectमाथिल्लो मुगु कर्णाली
A proposed 306 MW six-hour peaking project on the Mugu Karnali in Mugu, far-western Nepal, developed by Elevate Energy Ltd under the Golyan Group — upstream of the much larger Mugu Karnali storage scheme.
Installed capacity
306 MW
Peaking run-of-river
River / basin
Mugu Karnali
Karnali basin
Location
Mugu
Karnali
Expected online
TBD
Proposed / under development
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- Survey / feasibility stage
Under development by Elevate Energy (Golyan Group)
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Upper Mugu Karnali Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.