Upper Bheri Hydroelectric Projectमाथिल्लो भेरी
A proposed 325 MW peaking run-of-river project on the Bheri in Tripurasundari and Mudkechula, Dolpa, Karnali, being developed by the IMS Group. It is in the pre-construction stage.
Installed capacity
325 MW
Peaking run-of-river
River / basin
Bheri
Karnali basin
Location
Dolpa
Karnali
Expected online
TBD
Proposed / under development
Milestones & projected timeline
Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.
- Survey / pre-construction
Under development by the IMS Group in Dolpa
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Upper Bheri Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.