Nalgad (Nalsing Gad) Storage Hydroelectric Projectनलगाड (नल्सिंगगाड) जलाशय आयोजना

A 417 MW storage project (4 × 104.25 MW) with a 248 m RCC dam on the Nalgad River, a Bheri tributary, in Jajarkot, creating a 474 million m³ reservoir. Promoted by Nalgad Hydropower Company, it was ranked the top-priority storage site in Nepal's 1999–2001 storage study, but remains at the study/development stage with no construction.

Installed capacity

417 MW

Storage

River / basin

Nalgad (Bheri tributary)

Karnali basin

Location

Jajarkot

Karnali

Expected online

TBD

Proposed / under development

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. 1999–2001

    Identified as first-priority storage project

  2. 2023

    Updated cost estimate (~USD 1.3–1.4 billion)

  3. TBDPlanned

    Construction subject to financing

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Nalgad (Nalsing Gad) Storage Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.