AmarnepalBudget Analysis
OperationalCommissioned 2024

Likhu 1 Hydropower Projectलिखु-१

A 77 MW run-of-river plant on the Likhu Khola in Ramechhap/Okhaldhunga, part of the MV Dugar Group's Likhu cluster, with three vertical Pelton turbines supplied by Andritz. It commissioned around 2024.

Installed capacity

77 MW

Run-of-river

River / basin

Likhu Khola

Koshi basin

Location

Ramechhap

Bagmati

Commissioned

2024

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 2024

    Commissioned

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Likhu 1 Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.