AmarnepalBudget Analysis
OperationalOperational

Bagmati Khola Hydropower Projectबागमती

A ~22 MW run-of-river plant on the Bagmati River, among Nepal's operational IPP plants feeding the national grid.

Installed capacity

22 MW

Run-of-river

River / basin

Bagmati

Bagmati basin

Location

Makwanpur

Bagmati

Expected online

TBD

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

A detailed milestone timeline for this project is not yet documented in our sources.

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Bagmati Khola Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.