AmarnepalBudget Analysis
OperationalCommissioned 2023

Upper Sanjen Hydroelectric Projectमाथिल्लो सान्जेन

A 14.8 MW run-of-river plant at Simbu, Rasuwa (around 2,187 m elevation), the upper cascade stage above the 42.5 MW Sanjen plant. Built by Sanjen Jalavidhyut Company Ltd, part of the Chilime/NEA group, its output is evacuated through Chilime's transmission system.

Installed capacity

15 MW

Run-of-river

River / basin

Sanjen Khola

Koshi basin

Location

Rasuwa

Bagmati

Commissioned

2023

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. Aug 2023

    Began generating electricity

  2. 2024

    Counted among Chilime's three completed projects adding 168 MW

    Alongside Sanjen (42.5 MW) and Rasuwagadhi (111 MW)

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Upper Sanjen Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.