AmarnepalBudget Analysis
Under constructionExpected 2027

Upper (Mathillo) Kabeli Hydropower Projectमाथिल्लो काबेली

A 28.1 MW run-of-river project on the Kabeli Khola in Sirijangha Rural Municipality, Taplejung (spanning the Panchthar/Taplejung boundary), developed by Peace Energy Company Ltd. It uses a net head of about 183 m and a 5.6 km headrace tunnel, and is part of the Kabeli corridor cluster.

Installed capacity

28 MW

Run-of-river

River / basin

Kabeli Khola

Koshi basin

Location

Taplejung

Koshi

Expected online

2027

Under construction

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. 1 Jan 2024

    Construction began

  2. 2024

    First concrete pours at headworks and powerhouse; headrace tunnel excavation underway

  3. 1 Jan 2027

    Required commercial operation date (RCOD) under the NEA PPA

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Upper (Mathillo) Kabeli Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.