AmarnepalBudget Analysis
OperationalCommissioned 2013

Sipring Khola Hydroelectric Projectसिप्रिङ खोला

A 10 MW run-of-river plant on the Sipring Khola in Dolakha, developed by Synergy Power Development Ltd, generating to the grid since the start of 2013.

Installed capacity

10 MW

Run-of-river

River / basin

Sipring Khola

Koshi basin

Location

Dolakha

Bagmati

Commissioned

2013

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 19 Dec 2012

    Generation began (2069-10-03 BS)

  2. Jan 2013

    Commercial operation date

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Sipring Khola Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.