A 10 MW run-of-river plant on the Sipring Khola in Dolakha, developed by Synergy Power Development Ltd, generating to the grid since the start of 2013.
Installed capacity
10 MW
Run-of-river
River / basin
Sipring Khola
Koshi basin
Location
Dolakha
Bagmati
Commissioned
2013
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 19 Dec 2012
Generation began (2069-10-03 BS)
- Jan 2013
Commercial operation date
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Sipring Khola Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.