Piluwa Khola Hydropower Stationपिलुवा खोला
A 3 MW run-of-river plant on the Piluwa Khola (Arun basin) in Sankhuwasabha, developed by Arun Valley Hydropower Development Company. In operation since 2003.
Installed capacity
3 MW
Run-of-river
River / basin
Piluwa Khola
Koshi basin
Location
Sankhuwasabha
Koshi
Commissioned
2003
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 2003
Commissioned (2060 BS)
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Piluwa Khola Hydropower Station are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.