Likhu-2 Hydropower Projectलिखु-२
A 55 MW run-of-river plant on the Likhu Khola, which forms the border between Ramechhap and Solukhumbu, with a net head of about 230 m and Andritz Pelton turbines. It was originally developed by Global Hydropower Associate Pvt. Ltd. and later acquired by the MV Dugar Group as part of its Likhu-corridor cluster. Trial generation began in mid-2023.
Installed capacity
55 MW
Run-of-river
River / basin
Likhu Khola
Koshi basin
Location
Ramechhap
Bagmati
Expected online
TBD
Operational
Milestones to commissioning
The route from construction to commercial operation.
- Jul 2023
Trial production began
Connected to the national transmission line; ~20 MW produced during initial testing
- 2023
Commercial operation
- later
Ownership moved to MV Dugar Group
Acquired from Global Hydropower Associate Pvt. Ltd.
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.