Karnali Chisapani Multipurpose Projectकर्णाली चिसापानी बहुउद्देश्यीय आयोजना

A long-proposed 10,800 MW reservoir mega-project with a ~270 m dam at the Chisapani Gorge on the Karnali River, storing ~12.5 billion m³ for power, irrigation and flood control. Feasibility studies date from the 1960s to 1989 (capacity fixed at 10,800 MW). The government has directed NEA to prepare a fresh DPR and is exploring multi-country financing, but it remains decades from construction.

Installed capacity

10,800 MW

Reservoir

River / basin

Karnali

Karnali basin

Location

Surkhet / Bardiya / Kailali

Karnali / Lumbini / Sudurpashchim

Expected online

TBD

Proposed / under development

Project timeline

Milestones & projected timeline

Key dates so far, with planned milestones marked. Future dates are targets from the developer or government and frequently shift.

  1. 1962–1989

    Successive feasibility studies (capacity set at 10,800 MW)

  2. 2023–25

    Cabinet directs NEA to prepare DPR; financing explored

  3. TBDPlanned

    Construction far in the future if financed

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Karnali Chisapani Multipurpose Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.