Indrawati III Hydropower Projectइन्द्रावती-३
A 7.5 MW run-of-river plant on the Indrawati River in Sindhupalchok, developed by National Hydropower Company Ltd. In operation since 1999 and one of Nepal's early publicly listed IPP plants.
Installed capacity
7.5 MW
Run-of-river
River / basin
Indrawati
Koshi basin
Location
Sindhupalchok
Bagmati
Commissioned
1999
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 1999
Commissioned
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Indrawati III Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.