Indrawati III Hydropower Projectइन्द्रावती-३

A 7.5 MW run-of-river plant on the Indrawati River in Sindhupalchok, developed by National Hydropower Company Ltd. In operation since 1999 and one of Nepal's early publicly listed IPP plants.

Installed capacity

7.5 MW

Run-of-river

River / basin

Indrawati

Koshi basin

Location

Sindhupalchok

Bagmati

Commissioned

1999

Operational

How it was built

Milestones to commissioning

The route from construction to commercial operation.

  1. 1999

    Commissioned

On the map

Location

Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.

Loading map…
Filter by stageTiles © OpenStreetMap contributors

Sources & data note

Figures for Indrawati III Hydropower Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.