Dordi-1 Hydroelectric Projectदोर्दी-१
A 12 MW run-of-river plant on the Dordi Khola in Lamjung, developed by Dordi Khola Jal Bidyut Company Ltd — majority-owned (about 85%) by Lamjung Electricity Development Company (LEDCO) and listed on NEPSE as DORDI. It connected to the grid through the Dordi corridor.
Installed capacity
12 MW
Run-of-river
River / basin
Dordi Khola
Gandaki basin
Location
Lamjung
Gandaki
Commissioned
2022
Operational
Milestones to commissioning
The route from construction to commercial operation.
- 2021
IPO issued; company listed on NEPSE
- 2022
Commercial operation via the Dordi corridor
Location
Approximate dam-area location on OpenStreetMap — precise to the district and river reach, not the exact structure.
Sources & data note
Figures for Dordi-1 Hydroelectric Project are compiled from the sources below and cross-checked where possible. Status and projected dates reflect research as of mid-2026 and may change as the project progresses. The map location is an approximate dam-area estimate. Commentary is Amarnepal's own.